Norra Länken

CityStockholm
CountrySuede
ClientTrafikverket
Contract typeDesign and build

In Stockholm, the transportation infrastructure is being revamped to meet growing demands. This includes Norra Länken, the Swedish capital’s northern bypass, part of the ring highway system, which is slated to open for traffic at the end of 2015. HOCHTIEF Solutions’experts possess all the know-how this demanding project requires and are responsible for three packages of work. Challenges include the extremely hard ground, the high density of construction sites, the heavy traffic, and the logistics involved in working in a densely built-up city that stretches across 14 islands. The HOCHTIEF contracts comprise the construction of two tunnels, each 1.2 kilometers long and two lanes wide; a section of road about one kilometer long, including ramps and turnoffs; and the construction of a new bridge with three lanes in each direction, including cycle and pedestrian paths plus an optional tram lane.

In addition to optimizing the cut-and-cover sections by means of value engineering, the experts of HOCHTIEF Engineering developed innovative design solutions. For the inner lining of the two tunnel tubes, a new solution using new construction materials was applied.

Copyright © HOCHTIEF

HOCHTIEF Solutions Filial Sverige
Färögatan 33
164 51 Kista • Schweden
Tel: +46 8 5883-7020
Fax.:
sweden@hochtief.de
www.hochtief-solutions.de

HOCHTIEF Engineering GmbH
Alfredstraße 236
45133 Essen • Deutschland
Tel: +49 201 824-1436
Fax.: +49 201 824-2742

www.hochtief-engineering.de

HOCHTIEF Infrastructure GmbH
Opernplatz 2
45128 Essen • Deutschland
Tel: +49 201 824-2734
Fax.:

www.hochtief-infrastructure.de

Similar projects in segment Roads
Highway A 8

Highway A 8 • Germany

Highway A1/A6

Highway A1/A6 • Amsterdam• Netherlands

Gateway WA Perth Airport and Freight Access

Gateway WA Perth Airport and Freight Access • Perth, WA• Australia